The Plain Record

Neutral daily news — clear headlines, complete facts.

Business

President Trump Announces $4.2 Billion Audi Plant for Georgia

President Trump announced that Audi will invest $4.2 billion to build a new SUV factory in Macon, Georgia, creating an estimated 4,500 jobs.

Published October 24, 2026 at 10:06 PM EDT

The short answer

President Trump announced that Audi will invest $4.2 billion to build a new SUV factory in Macon, Georgia, creating an estimated 4,500 jobs. President Donald Trump announced on Saturday, October 24, 2026, that Audi will build a new automobile manufacturing plant in Georgia.

President Trump Announces $4.2 Billion Audi Plant for Georgia

The Facts

Who
President Donald Trump, Audi Chairman Gernot Döllner, and Volkswagen AG
What
Announcement of a new Audi manufacturing plant in Macon, Georgia.
When
Saturday, October 24, 2026
Where
Perry and Macon, Georgia
Why
To bolster American manufacturing and provide a political lift to Republican candidates ahead of the 2026 midterms.

President Donald Trump announced on Saturday, October 24, 2026, that Audi will build a new automobile manufacturing plant in Georgia. The announcement was made during a campaign rally in Perry, Georgia, as the president campaigned for Republican candidates ahead of the November 3 midterm elections.

The factory represents the first Audi plant in Georgia and will be located in Macon. Audi, a German luxury brand owned by Volkswagen AG, plans to invest $4.2 billion in the facility. According to the company, the plant is designed to produce 200,000 cars annually, specifically focusing on the brand’s largest and most premium SUVs.

Construction on the Macon site is scheduled to begin in 2027, with vehicle production expected to start in the early 2030s. Audi reported that the project will create approximately 4,500 jobs. Gernot Döllner, chairman of the board of management at Audi, joined the president on stage to describe the move as a long-term investment in the American market.

The concrete day-to-day change for residents will not be immediate, as construction is not slated to begin for another year, and the full impact on local payrolls and production will not be realized until the early 2030s. At that point, the regional labor market will see the addition of thousands of manufacturing roles. The announcement also involves Volkswagen AG's broader U.S. strategy, which includes plans to expand an existing facility in South Carolina. Bloomberg reported that the automaker is hopeful the commitment will lead to relief from tariffs that have affected company profits.

The next steps for the project include the formal commencement of construction in 2027. Politically, the announcement serves as a late-stage development before the November 3 midterms, where candidates like Rep. Mike Collins (R-GA) are contesting seats such as the one held by Sen. Jon Ossoff (D-GA). While the plant's production timeline extends into the next decade, the immediate political focus remains on the upcoming election day. Details regarding specific state-level tax incentives or the exact start date for hiring have not been reported.

Timeline of what happened

Key dates and decisions, in the order they occurred.

  1. October 24, 2026

    Project announcement at rally

    President Trump makes the announcement during a campaign rally in Perry, Georgia.

  2. November 3, 2026

    Midterm Election Date

    Midterm elections for the U.S. House and Senate are scheduled to take place.

  3. 2027

    Scheduled start of construction

  4. January 1, 2030

    Target for start of production

Summaries are written by The Plain Record to state the facts of a story plainly and without political slant. Drafted with AI assistance and checked against the source record before publication. See how we report, or report a correction.

← Back to the front page

Questions readers ask

What happened: President Trump Announces $4.2 Billion Audi Plant for Georgia?

President Donald Trump announced on Saturday, October 24, 2026, that Audi will build a new automobile manufacturing plant in Georgia. The announcement was made during a campaign rally in Perry, Georgia, as the president campaigned for Republican candidates ahead of the November 3 midterm elections.

Who is involved?

President Donald Trump, Audi Chairman Gernot Döllner, and Volkswagen AG

When did this happen?

Saturday, October 24, 2026

Where did this happen?

Perry and Macon, Georgia

Why does this matter?

To bolster American manufacturing and provide a political lift to Republican candidates ahead of the 2026 midterms.