The Plain Record

Neutral daily news — clear headlines, complete facts.

On the Hill

Rep. Beyer Reports Construction Activity at Proposed Trump Arch Site

Rep. Don Beyer (D-VA) says the Trump administration is prepping construction of a 250-foot arch near D.C. despite a court order requiring prior notice.

Published September 24, 2026 at 4:50 PM EDT

The short answer

Rep. Don Beyer (D-VA) says the Trump administration is prepping construction of a 250-foot arch near D.C. despite a court order requiring prior notice. Rep. Don Beyer (D-VA) stated on Thursday, September 24, 2026, that the Trump administration appears to be preparing for the construction of a proposed 250-foot arch on Columbia Island, just outside Washington.

Rep. Beyer Reports Construction Activity at Proposed Trump Arch Site

The Facts

Who
Rep. Don Beyer (D-VA), President Donald Trump, Secretary of the Interior Doug Burgum, and the Advisory Council on Historic Preservation.
What
Rep. Don Beyer (D-VA) reported that construction vehicles and heavy equipment have arrived at the proposed site of a 250-foot memorial arch on Columbia Island. Beyer claimed the administration is bypassing legal requirements and a court order to fast-track the project, while the Advisory Council on Historic Preservation announced it would conclude its review without further local consultation.
When
Thursday, September 24, 2026
Where
Columbia Island, Virginia
Why
The administration is attempting to move forward with a large-scale construction project that a National Park Service report says will adversely affect Arlington National Cemetery and the Lincoln Memorial. The project faces legal challenges, local opposition over traffic and safety concerns, and unresolved FAA aviation safety reviews.

Rep. Don Beyer (D-VA) stated on Thursday, September 24, 2026, that the Trump administration appears to be preparing for the construction of a proposed 250-foot arch on Columbia Island, just outside Washington. Beyer reported visiting the site that morning after constituents alerted him to the presence of heavy machinery. While construction workers at the scene told Beyer they were performing archaeological assessments of the soil, the congressman said the activity suggests the administration is moving forward with the project despite an ongoing legal dispute.

The proposed arch, intended to commemorate the 250th anniversary of the United States, has faced opposition from local officials and federal lawmakers. Earlier in September, a federal judge issued an order requiring 48 hours' notice for "any activity" at the site and 14 days' notice before formal construction begins. The order provided an exception for archaeological work. Beyer stated that the presence of surveyors and heavy equipment indicates a transition toward active construction, which he argues is illegal without specific congressional authorization.

On the same day as Beyer's visit, the Advisory Council on Historic Preservation (ACHP) announced it would conclude its review of the project by submitting recommendations directly to the Department of the Interior. This move ended consultations with local government historians in Virginia and Washington, D.C. The General Services Administration (GSA) describes these Section 106 consultations as an "integral component" of federal projects to ensure public concerns about historic preservation are considered. However, the ACHP stated it would proceed after officials in both jurisdictions declined to approve the plan, citing concerns about its impact on historic sites.

A National Park Service "Assessment of Effect" report found that the 250-foot structure would "adversely affect" dozens of historic locations, including the Lincoln Memorial, the Washington Monument, and the George Washington Memorial Parkway. Rep. Beyer, whose district includes the site, has warned that the project will create significant traffic congestion on major roadways. According to Beyer, local officials in Arlington County have also raised concerns regarding the impact on transportation infrastructure, which they say could hinder the ability of emergency responders to move through the area.

President Trump said on Sunday, September 20, 2026, that the structure would serve as a functional security hub housing snipers, drones, and ammunition. For families who visit or have relatives interred at Arlington National Cemetery, the National Park Service has acknowledged the project would disrupt the site. Furthermore, the Federal Aviation Administration (FAA) previously stated that a full aeronautical study is required to evaluate potential flight risks for air traffic at Reagan National Airport (DCA), though Beyer notes this study has not been completed. The National Transportation Safety Board (NTSB) has investigated whether other White House construction contributed to a recent incident involving Marine One.

Legal and legislative challenges remain for the administration. The Arlington National Cemetery Viewshed Protection Act, introduced by Beyer, seeks to prohibit the construction of the arch. While Secretary of the Interior Doug Burgum announced on September 3, 2026, that excavation work would begin within two weeks, the project is still undergoing a review by the ACHP. The Section 106 review will be considered concluded once the Secretary of the Interior responds to the ACHP’s final comments. The administration is currently required by court order to provide notice before changing the nature of the work at the site.

Timeline of what happened

Key dates and decisions, in the order they occurred.

  1. May 27, 2026

    Beyer introduces Arlington National Cemetery Viewshed Protection Act

  2. September 3, 2026

    Interior Secretary Burgum announces excavation work will begin within two weeks

  3. September 20, 2026

    President Trump posts that the arch will house snipers and drones

  4. September 24, 2026

    ACHP terminates Section 106 consultation with local historians

  5. September 24, 2026

    Rep. Beyer reports seeing heavy equipment at Columbia Island site

Summaries are written by The Plain Record to state the facts of a story plainly and without political slant. Drafted with AI assistance and checked against the source record before publication. See how we report, or report a correction.

← Back to the front page

Questions readers ask

What happened: Rep. Beyer Reports Construction Activity at Proposed Trump Arch Site?

Rep. Don Beyer (D-VA) reported that construction vehicles and heavy equipment have arrived at the proposed site of a 250-foot memorial arch on Columbia Island. Beyer claimed the administration is bypassing legal requirements and a court order to fast-track the project, while the Advisory Council on Historic Preservation announced it would conclude its review without further local consultation.

Who is involved?

Rep. Don Beyer (D-VA), President Donald Trump, Secretary of the Interior Doug Burgum, and the Advisory Council on Historic Preservation.

When did this happen?

Thursday, September 24, 2026

Where did this happen?

Columbia Island, Virginia

Why does this matter?

The administration is attempting to move forward with a large-scale construction project that a National Park Service report says will adversely affect Arlington National Cemetery and the Lincoln Memorial. The project faces legal challenges, local opposition over traffic and safety concerns, and unresolved FAA aviation safety reviews.