U.S. Transportation Secretary Sean Duffy stated on Wednesday, Nov. 18, 2026, that a nationwide aviation ground stop occurring on Friday, Nov. 13, could have concluded earlier if a federal contractor had identified the technical issue sooner. Duffy said the contractor, L3Harris, failed to quickly isolate a router problem that disrupted air traffic control facilities for more than four hours, resulting in the longest ground stop since 2001.
The disruption began after a newly installed Juniper router in Arkansas started sending out thousands of connection attempts shortly after being activated. This work was part of a Federal Aviation Administration (FAA) project to replace copper wiring with fiber optic lines. Investigators are currently focused on whether the router was configured incorrectly by a technician or if the device itself was faulty, while the manufacturer maintains the device functioned as it was programmed.
Federal Aviation Administration Administrator Bryan Bedford stated on Wednesday that he takes full responsibility for the incident as the agency's "chief accountability officer," regardless of the contractor's role. L3Harris, which has maintained FAA networks for decades, pledged on Saturday to support the ongoing investigation. The FAA has paused all new installations of this specific router model and disabled the function associated with the outage while testing continues.
For airline passengers and crews, the Nov. 13 event demonstrated that the FAA’s primary and backup systems can fail simultaneously during technical upgrades. Chris Sununu, president of the Airlines for America trade group, noted that because the agency is attempting to bridge multigenerational technologies—likening it to making an iPhone communicate with a flip phone—additional technical disruptions may occur during the modernization process.
The investigation into the Arkansas router is ongoing to determine the cause of the failure. The FAA stated that the current delay in spending its existing budget is due to the time needed to build specialized radars and systems. While the agency seeks the $50 billion in funding, Congress has not yet set a date for a vote on the request.